What is a Slip Blueprint
A slip blueprint is a preset for frequently used slips. If you are creat...
How do I convert a timed slip to a fixed slip?
If you have set up a slip to track time by accident and want to adjust i...
How do I move working slips from one project to another?
Slips can be moved between projects, whether they are for the same clien...
Why do managers have visibility of approved slips on projects that aren't assigned to them?
Any full or admin worker can be an approver on a project. Even though th...
Unexpected Slip Totals
Unexpected Totals for Timed Slips
When managing your slips you may notic...
Approving Slips
Approvals are necessary to ensure the accuracy and validity of slips bef...
2.14 Blueprint Slips on the Mac
This video shows you how to take advantage of blueprints as a huge times...
2.9 Creating Slips on the Mac
This video will show power users some handy shortcuts to create slips us...
Working with Estimate Slips on Mac
This video shows you how to create, edit, and work with Estimate slips, ...
Slip Totals are Incorrect
Symptom
When reviewing slips totals, either in the project view or on an...
How do I convert a working slip into an estimate slip?
A working slip cannot be converted to an estimate slip. The correct work...
How can I link an unfiled slip to a Project?
You can link unfiled slips to projects on Mac and iOS. Below are the dif...